Product and Machine Type Hierarchy

  Product Configuration Lifecycle / Promotion

A Sellable Item, FRU or CRU can not be promoted (or Released) unless connected to an Active state product configuration.

An error message displays if you attempt to promote a Sellable Item, FRU, or CRU out of Preliminary state without connection to an Active product configuration.

 

To promote a product configuration to Active state requires:

See also, Promote/Demote Objects, Product Configurations, Create a Product Configuration, Edit a Product Configuration, Connect a Part to an Existing Product Configuration.

To Promote

Prod Con Info Bar

  1. Access Product Configuration.

The Info Bar, always displayed above the part page, shows a State lifecycle graphic that is interactive and allows promotion and demotion as allowed by your permissions and the object lifecycle rules

  1. Click on the desired lifecycle state.

If the promotion/demotion is successful, the lifecycle graphic changes to reflect the new state.

For a failure, an error message displays the reasons.

Prod Con Lifecycle Page

  1. Access Product Configuration.

  2. Click Lifecycle on the product configuration category tree.

The product configuration Lifecycle/Review PowerView displays the product configuration Lifecycle at the top and related Approvals/Tasks and Routes on tabs at the bottom.

  1. Click on the Lifecycle tab page tool bar to advance one state or click Promote to Acti... to skip unused lifecycle states directly Active.

If no actions are available on the page tool bar, you may not have the Project Manager ENOVIA role which is necessary to promote a product configuration.

One or More on Product Configurations Page:

  1. Select Project Management App > Product > Product Configurations.

  2. Select one or more product configurations using the check boxes .

  3. Use the or buttons to promote or demote, respectively.

A confirmation message appears.

  1. Click .

The page refreshes, showing the new lifecycle state of each selected item.

If a promotion/demotion fails, a Results of Action window displays the reasons for failure.

One or More in a Collection:

  1. Access a Collection with product configurations.

  2. Select one or more product configurations using the check boxes .

  3. Use the or buttons to promote or demote, respectively.

A confirmation message appears.

  1. Click .

The page refreshes, showing the new lifecycle state of each selected item.

If a promotion/demotion fails, a Results of Action window displays the reasons for each failure.