  Change a Development Part to a Production Part

Converting a Development part to Production policy:

When the development phase of a project is nearing manufacture, all parts must be converted to Production policy.

A Development part in the Complete state can be converted to a Production policy part directly or through an Engineering Change (EC).

When the part is converted directly using Go To Production (below), an EC is still required to Release the Production part.

See Attach Parts to EC and set Requested Change to for Release to use an EC to go to Production.

When a part is converted from Development to Production:

Using numeric revisions in Development parts eliminates the need to create a new part revision when converting to Production.

Go To Production

To create a Preliminary state revision of a Complete state Development part:

  1. Access the Development part.

  1. Click Lifecycle on the Part Category Tree.

  1. Select >Go To Production on the page tool bar.

For Development parts with an alphabetical bubble level revision, a new, numeric revision is created.

For Development parts with a numeric revision level, the Properties page of the current revision, now with Production policy in Preliminary state, is displayed.