Costs are created:
The Cost page of the part, accessed on the Part Category Tree.
Flat BOM tab of the EBOM PowerView, accessed on the Part Category Tree.
See View Part Costs.
The Cost Analyst ENOVIA system role is required to create a cost.
Call the PLM Support Hotline to request additional ENOVIA roles.
Multiple costs may be created or updated at once using the Cost Import Template.
To create a cost:
On the part Cost page, click on the page tool bar and select Create New. . . .
Or
On the EBOM PowerView, Flat BOM tab, View: Costs, right click on the parent or any child part in the BOM and select Create Cost on the pop up, context menu.
The part: Create Part Cost window displays.
Enter the following details:
Cost Attribute fields |
Description |
Description |
Enter a description of this cost. |
Cost Provider |
The default is Lexmark. If the cost comes from a source outside of Lexmark, click to search for and select a supplier / partner / contract manufacturer / vendor. |
Location/Subsupplier |
This field is mainly used to assign a Cost Family to identify costs by project. Parts may be used across multiple projects. Different projects may create their own estimates or get different part costs from a single Cost Provider as a result of varying quantities, or fluctuating material and labor costs.
|
Location Type |
|
Cost Value Type |
The type is an identifying cost attribute:
A cost of a particular type may be revised. For a different type, create a new cost. See Cost Value Types more information. |
Production Make Buy Code |
Select how the part is procured:
|
Include Children in Rollup |
Often called ICIR. Determine if the costs of BOM children are summed into the part cost:
When Production Make Buy Code = Buy, ICIR automatically sets to No. Different costs for the same part may have different ICIR settings. For example, a subassembly may be ICIR = Yes on the cost relative to the supplier who builds it. But when that subassembly is rolled up into the cost of a printer at another supplier, the ICIR might be No. |
Item Material Cost |
|
Item Freight Cost |
|
Item Labor Hours |
|
Item Labor Cost |
|
Item Variable Cost |
|
Item Fixed Cost |
|
Item Adjusted Cost |
|
Adjusted Cost Description |
Enter the reason for the adjustment. |
Variance |
|
Overhead |
|
SGA |
Selling, General, and Administrative expense |
Taxes and Profit |
|
Labor |
|
3PL |
Third Party Logistics |
Transportation |
|
Insurance |
|
Management Fees |
|
MVA |
Manufacturing Value Add |
VMI |
Vendor Managed Inventory |
Click Done.
The page redisplays, showing the new cost.
The cost name is concatenated from the part name, part revision, cost value type, cost provider, and location/subsupplier (cost family).
Click the Name link to view the cost Properties page. See View Part Costs for more information.