Costs

  View Cost Reports

Cost reports are listed on the Reference Reports page of a cost and may also be accessed on the EBOM PowerView, Flat BOM tab, or the part Costs page.

If one or more parts in the BOM do not have a cost that fits the cost report preferences, a separate "Error" report is generated, listing those parts that do not have a cost that was included in the cost report.

  1. Reports that only list the BOM children that do not have a cost included in the report begin with the word "Error".

To view cost reports:

  1. Navigate to the part with the cost reports to view.

  2. Access the EBOM PowerView, Flat BOM tab, or the part Costs page. See View Part Costs.

Be sure to click to expand all the entries in the Flat BOM, displaying all costs under each part.

Any cost with an available report shows the reports icon in the reports column.

  1. Click the icon in the row of the cost with reports you wish to view.

From the Flat BOM tab, the Ref Rpts list appears in the right pane of the display.

From the part Costs page, the Reference Reports page of the selected cost opens in a new window.

On either the Flat BOM tab or part Costs page, you may click a cost name to open it, and then select Reference Reports on the cost category tree to view the cost reports.

  1. Click the name link of a cost report.

A Flat BOM Report or BOM Cost Rollup Report opens in a new window.

Error reports open a Download File window to download an export file.

 

Generate Metrics from a Cost Report

  1. Click on the BOM Cost Rollup Report or Flat BOM Report page tool bar.

The Actions menu displays.

  1. Select one of the following functions:

Cost Report Functions

Description

Export

Select Export to create a spreadsheet containing the cost report data.

 

Note: All fields in the cost report are exported to the spreadsheet and can be manipulated and graphed as needed. This export can be used to modify a number of costs at once and then import them back into ENOVIA . See Cost Import Template.

Currency Split

Shows percentage of cost that is split with another currency and the exchange rate.

Compare Target Vs. Calculated

Creates a bar chart that compares the Total Target costs to the Total Cost for each first-level child in the BOM of the select part.

 

Note: the sum of the child part costs may not equal the total costs because a portion of the Total Cost may be generated by the parent.

Item Total Cost Driver

Creates a bar chart that compares the percentages that each first-level child contributes to the Total Cost of the select parts.

Item Cost Breakdown Report

Creates a bar chart that compares percentages that each itemized  cost element contributes to the Total Cost of the selected part. You are prompted to select Cost Elements to include in the Rollup.

Cost Confidence Report

Not used